Relocation and modernization design of a paper machine MP7 and a coating machine – Ilim Group, Koryazhma, 2010-2013
Grzegorz Nowak
Executive Director
Year: 2010-2013
Location: Russia
Lead time: 3 years
- investment feasibility study
- building permit documentation
- Assistance with marking and disassembly of machines
- drawing up the required alterations to the machines
- deployment of the machines
- basic engineering design
- as built documentation
- Assembly supervision and launch assistance