
Design of a processing installation and recycling of own waste to current production – 2021
Grzegorz Nowak
Executive DirectorYear: 2021
Location: Poland
Execution time: 1 year
- Modification of the existing production line for the production of plasterboards
- Design of the rafiner’s supporting construction
- Modification of existing tanks
- Location of the new equipment






